PROJECT:

Shanxi Jincheng Qinshui County Lanjin gas generator unit multi - one project

COSTOMER:

Qinshui Lanjin Gas power generation Co. LTD

PAPER:

The project is located in Lanjin Gas Power station, Qinshui County, Jincheng city, Shanxi Province. There are four sets of 14 500KW gas generator sets, 12 1000KW gas generator sets, 9 1000KW gas generator sets, and 5 1000KW gas generator sets. The initial emission of NOx is < 3000mg/Nm³, and the emission of NOx after denitrification at low temperature is < 300mg/N. In order to meet the denitrification efficiency, it is necessary to open the front bypass valve of the waste heat boiler, raise the temperature at the reactor to 200℃, and reduce the unit load so that the original NOx emission can be reduced to less than 3000mg/N.


Shanxi Lanjin Gas power generation project(图1)

Recommend Article
About Ecosail
Ecosail Energy Technology Jiangsu Co., LTD
Building 6, 172 Erquan East Road, Dongting street, Xishan District, Wuxi City
0510-85112990
sales_m@ecosail.cn
Product
SCR-Denitration device
DOC-Carbon monoxide and hydroc
DPF-Dust removal device
catalyst
Culture
Sail together -- A Spring Tour of Exel 2020
Seize the day to live up to the 2019-2020 Xcel Annual Confere
Case
Huadian Panyu Wanbo CBD distributed

Huadian Panyu Wanbo CBD distributed

Shanghai Novartis Park Natural gas power generation project

Meishan Campus of Ningbo University

Xiamen East Solid waste Center landfill gas

Shijiazhuang First People's Hospital

Copyright © 2020 Ecosail  苏ICP备20044766号  Check Win

Home About Case Call