| PROJECT: |
|
Shanxi Jincheng Qinshui County Lanjin gas generator unit multi - one project |
| COSTOMER: |
|
Qinshui Lanjin Gas power generation Co. LTD |
| PAPER: |
|
The project is located in Lanjin Gas Power station, Qinshui County, Jincheng city, Shanxi Province. There are four sets of 14 500KW gas generator sets, 12 1000KW gas generator sets, 9 1000KW gas generator sets, and 5 1000KW gas generator sets. The initial emission of NOx is < 3000mg/Nm³, and the emission of NOx after denitrification at low temperature is < 300mg/Nm³. In order to meet the denitrification efficiency, it is necessary to open the front bypass valve of the waste heat boiler, raise the temperature at the reactor to 200℃, and reduce the unit load so that the original NOx emission can be reduced to less than 3000mg/Nm³. ![]() |