| PROJECT: |
|
Guangye Zhangshan Power Station 5X500KW |
| PAPER: |
|
There are altogether 5 500KW units for gas power station of this project. Due to the owner's demand for additional units in the future, the reactor shell is required to be designed according to Liuhe1 (i.e. 6x500KW), high temperature denitration, flue gas temperature 550℃, and original NOx emission ≤6000mg/Nm³ after denitration, NOx emission is required to be ≤300mg/Nm³. The original emission of NOx on site was > 5000mg/Nm³. Under the effect of design allowance, the NOx emission after denitration was no more than 300mg/Nm³, which was successfully tested and obtained by a third party. ![]() |