PROJECT:

Guangye Zhangshan Power Station 5X500KW

PAPER:

There are altogether 5 500KW units for gas power station of this project. Due to the owner's demand for additional units in the future, the reactor shell is required to be designed according to Liuhe1 (i.e. 6x500KW), high temperature denitration, flue gas temperature 550℃, and original NOx emission ≤6000mg/Nm³ after denitration, NOx emission is required to be ≤300mg/N. The original emission of NOx on site was > 5000mg/N. Under the effect of design allowance, the NOx emission after denitration was no more than 300mg/N, which was successfully tested and obtained by a third party.


Zhangshan Power Station, Shanxi Province(图1)

Recommend Article
About Ecosail
Ecosail Energy Technology Jiangsu Co., LTD
Building 6, 172 Erquan East Road, Dongting street, Xishan District, Wuxi City
0510-85112990
sales_m@ecosail.cn
Product
SCR-Denitration device
DOC-Carbon monoxide and hydroc
DPF-Dust removal device
catalyst
Culture
Sail together -- A Spring Tour of Exel 2020
Seize the day to live up to the 2019-2020 Xcel Annual Confere
Case
Huadian Panyu Wanbo CBD distributed

Huadian Panyu Wanbo CBD distributed

Shanghai Novartis Park Natural gas power generation project

Meishan Campus of Ningbo University

Xiamen East Solid waste Center landfill gas

Shijiazhuang First People's Hospital

Copyright © 2020 Ecosail  苏ICP备20044766号  Check Win

Home About Case Call