Qinshui Longxin gas power station

Time:2020-07-14 09:43
 
PROJECT:

Qinshui Longxin 2 4x500KW denitration

CUSTOMER:

Qinshui Longxin Gas power Generation Co. LTD

PAPER:

A total of 4 500KW units are designed for gas power station of this project. The design includes four-in-one high-temperature denitrification, flue gas temperature of 550℃, original NOx emission ≤3000mg/Nm³, and NOx emission ≤300mg/Nm³ after denitrification. The flue gas pipeline and the reactor were not insulated. The flue gas temperature before the reactor was only 350℃, which did not reach the temperature range of high catalytic denitrification efficiency. However, the NOx emission after denitrification was still no more than 300mg/N, which was successfully tested and obtained by a third party.

 
Qinshui Longxin gas power station(图1)

Recommend Article
About Ecosail
Ecosail Energy Technology Jiangsu Co., LTD
Building 6, 172 Erquan East Road, Dongting street, Xishan District, Wuxi City
0510-85112990
sales_m@ecosail.cn
Product
SCR-Denitration device
DOC-Carbon monoxide and hydroc
DPF-Dust removal device
catalyst
Culture
Sail together -- A Spring Tour of Exel 2020
Seize the day to live up to the 2019-2020 Xcel Annual Confere
Case
Huadian Panyu Wanbo CBD distributed

Huadian Panyu Wanbo CBD distributed

Shanghai Novartis Park Natural gas power generation project

Meishan Campus of Ningbo University

Xiamen East Solid waste Center landfill gas

Shijiazhuang First People's Hospital

Copyright © 2020 Ecosail  苏ICP备20044766号  Check Win

Home About Case Call